From To

BAIRA SIUL POWER STATION

BHALED TRENCH WEIR SITE

SIUL WAIR SITE

site2
site4

Minimum Required Flow(@15% of Lean Period)    Actual Flow

1.03 cumecs                                    2.24 cumecs

Minimum Required Flow(@15% of Lean Period)    Actual Flow

0.58 cumecs                                    0.62 cumecs