From
To
AWLR_2
AWLR_4
BAIRA SIUL POWER STATION
BHALED TRENCH WEIR SITE
SIUL WAIR SITE
Minimum Required Flow(@15% of Lean Period) Actual Flow
1.03 cumecs 2.24 cumecs
Minimum Required Flow(@15% of Lean Period) Actual Flow
0.58 cumecs 0.62 cumecs