From
To
AWLR_2
AWLR_4
BAIRA SIUL POWER STATION
BHALED TRENCH WEIR SITE
SIUL WAIR SITE
Minimum Required Flow(@15% of Lean Period) Actual Flow
1.03 cumecs 1.87 cumecs
Minimum Required Flow(@15% of Lean Period) Actual Flow
0.58 cumecs 0.63 cumecs